• 1909
    Entered into operation
  • 5 MW
    Installed capacity
  • 23、妇女
    Annual production

The power plant has a total head of 60.5m and the powerhouse is equipped with two Francis turbines, which receive water through a 276m long intake channel (2.5 x 3.5米(截面). The concrete gravity dam is 5m high.

 

Jucu hydropower plant
Jucu hydropower plant. (Photo: 十大最好的网赌平台)
公司 Ownership share
十大最好的网赌平台 81.31%
FUNCEF 18.69%

Find out more about our activities in 巴西